The KOMAN family of companies offers high-value solutions with low overhead, best-value pricing, and proven record of exceptional
performance ratings.

About Us

SWP Stormwater Plans, LLC is a full-service civil contractor offering excellent products and services at competitive prices.

The company was founded in 2005 on the principle that the client is the number one stakeholder in any project. It is our belief that a project can be profitable while still providing a 100% client satisfaction rating by ensuring that the needs of the client are the priority. Initially started as a civil engineering and consulting firm, SWP Contracting and Paving evolved from a specialty stormwater contractor, and now a renewed focus as a general contractor.

SWP Stormwater Plans, LLC is a full-service civil contractor offering excellent products and services at competitive prices.

The company was founded in 2005 on the principle that the client is the number one stakeholder in any project. It is our belief that a project can be profitable while still providing a 100% client satisfaction rating by ensuring that the needs of the client are the priority. Initially started as a civil engineering and consulting firm, SWP Contracting and Paving evolved from a specialty stormwater contractor, and now a renewed focus as a general contractor.

CAGE Code: 617P9

UEI: G1NKCBXYFLH3

Business Type: HUBZone, Small Disadvantaged Business, ANC-Owned, Indian Small Business Economic Enterprise (ISBEE)

Primary NAICS

  • 237310 – Highway, Street, and Bridge Construction

Solutions

Drainage

  • Basins
  • Channels
  • Culverts
  • Dam Repair
  • Erosion Control
  • Rip Rap
  • Gabion Baskets
  • Spillways

Earthwork/Grading

  • Demolition
  • Grading
  • Excavations
  • Wet & Dry Utilities
  • Bridge Repair
  • Construction & Milling

Civil Site Work

  • Flatwork & Structures
  • Sidewalks, Curb, & Gutter
  • Foundations
  • Retaining Walls
  • Spillways
  • Aprons
  • Slabs on Grade

Past Performance

The project work included:

  • Removal of the existing damaged trail bridge superstructure.
  • Disposal of the pre-existing trail bridge superstructure.
  • Supply of a fiber-reinforced polymer (FRP) trail bridge.
  • Supply and installation of decay resistant wood bridge deck planks.
  • Supply and installation of galvanized steel sill substructure.
  • Minor bridge approach work including adjustment of the bridge approaches elevations.

This project had an accelerated schedule. Project work included:

  • Removal and disposal of the existing timber bridge
  • Structural excavation and backfill
  • Minor hot asphalt concrete patch
  • Precast concrete members (spacer beam, backwall, and deck
    panel)
  • Structural steel beams
  • Cast-in-place concrete fill
  • Rock wall foundation repair
  • Metal pedestrian rail

Ancillary items included developing and implementing an erosion control and environmental protection plan, developing and implementing a trail closure, and developing and implementing a pedestrian and traffic control plan.

Contact Information

General Manager

George Pollock

Address

5624 N. 54th Avenue
Glendale, Arizona 85301

Phone

(508) 366-7442

Email

info@komangs.com