Pinal County
Job Order Contracting
Pavement Preservation & Repair Services
JOC Task Order #7, Red Rock Village Crack Seal: SWP was assigned this task order to provide crack seal maintenance within the subdivision. Cracks were cleaned and then sealed with 49,450LBS of CRAFCO Polyflex Type III. Additionally, SWP provided the entire traffic control, construction staking & layout, public relations, quality control and striping for the project.
JOC Task Order #8, Desert Views and Val Vista Estates Pavement Maintenance: SWP was assigned this task order to provide crack seal and asphalt patching maintenance within these two subdivisions. Asphalt patching consisted of milling full depth section, recompaction of subgrade, milling a T-Top, and placement of a MAG ½” Specification asphaltic concrete. Cracks were cleaned and then sealed with 24,100LBS of CRAFCO Polyflex Type III. Additionally, SWP provided the entire traffic control, construction staking & layout, public relations, quality control and striping for the project.