ADOT, SR 74 Morristown-New River Highway Asphalt Improvements (Sub)

\"\"
SR 74, Morristown- New River Highway, Picacho Was to Junction I17: Subcontractor $12,750

 Located on SR 74 in Maricopa County, beginning at Milepost 22.42 and extending easterly to Milepost 30.58 for a distance of approximately 8:16 miles. The project is located west of Carefree between Picacho Wash and 1-17.

Project Work Included:

  • Milling the existing deteriorated pavement and replacing it with Asphaltic Concrete (3/4\” Mix) (End Product) (Special Mix)
  • New Asphalt Rubber-Asphaltic Concrete Friction Course (AR-ACFC) and Asphaltic Concrete (Misc. Structural)
  • Striping
  • Traffic control.
  • Routing, cleaning, and placement of crack seal material.