SR 74, Morristown- New River Highway, Picacho Was to Junction I17: Subcontractor $12,750
Located on SR 74 in Maricopa County, beginning at Milepost 22.42 and extending easterly to Milepost 30.58 for a distance of approximately 8:16 miles. The project is located west of Carefree between Picacho Wash and 1-17.
Project Work Included:
- Milling the existing deteriorated pavement and replacing it with Asphaltic Concrete (3/4\” Mix) (End Product) (Special Mix)
- New Asphalt Rubber-Asphaltic Concrete Friction Course (AR-ACFC) and Asphaltic Concrete (Misc. Structural)
- Striping
- Traffic control.
- Routing, cleaning, and placement of crack seal material.