SR303 Loop, US60- Happy Valley Parkway: Prime Contractor $29.8 M
SWP was brought on in the initial stages to provide:
- Design and constructability review
- Write quality control plan and quality management plan
- Supervise the Quality Control Program.
- Oversight of PCCP placement and inspection to ensure compliance with specifications and standards.
The project milled/pulverized existing asphaltic concrete and blended it with the existing aggregate base to produce a base course to be placed under the new PCCP.