ADOT, Happy Valley Parkway Design-Build (Sub)

\"\"

SR303 Loop, US60- Happy Valley Parkway: Prime Contractor $29.8 M

SWP was brought on in the initial stages to provide:

  • Design and constructability review
  • Write quality control plan and quality management plan
  • Supervise the Quality Control Program.
  • Oversight of PCCP placement and inspection to ensure compliance with specifications and standards.

The project milled/pulverized existing asphaltic concrete and blended it with the existing aggregate base to produce a base course to be placed under the new PCCP.