Category Archives: #Aviation

Yuma Proving Grounds, Hangar 2882 Ramp Grading Design & Construction

US Army Corp - General Atomics Aeronautical Systems, Inc. Miles Construction Group YPG-Hangar 2882 and Ramp Grading Design & Grading General Atomics required a new hangar built along the Laguna Airfield at YPG Yuma, Arizona to test a variety of classified aircraft. They required a full set of plans, submittals, and approvals from both US Army Core and YPG Public Works Continue Reading

Read more

DMAFB, Taxiway Edge Lighting Installation

Taxiway Edge Lighting Installation (Design-Build), Davis Monthan Air Force Base, Tucson, AZ Taxiway A1 (Renovation Work) – SWP removed existing edge lights and components on the southeast intersection of Taxiways A and A1 and replaced with new AC pavement. The light components were removed and properly disposed of off-base, along with any existing electrical cabling. Conduit was removed as necessary to permit Continue Reading

Read more

Goodyear Airport Runway Rehabilitation

Phoenix – Goodyear Airport Runway Rehabilitation, Goodyear, AZ: Subcontractor  The Phoenix – Goodyear Airport Runway rehabilitation included a 3” mill, crack sealing prior to paving, and an overlay of the existing asphalt runway, protection of existing signage and lighting, and remarking the runway. This was a federally funded project. The project has two different allowance items including: -18” Wide Paving Fabric Continue Reading

Read more

USACE, 161st @ Sky Harbor International Airport Road Work

161st ARW, Sky Harbor, Air National Guard, Phoenix, AZ: Prime $310,156 SCOPE OF WORK: CLIN 0001: Seal Coat East Parking Lot: SWP provided all labor, equipment, material, and supervision necessary to perform crack sealing and application of an asphalt emulsion seal coat to the existing asphalt pavement of the East Parking Lot. The East Parking Lot is estimated at approximately 68,375 square feet. Continue Reading

Read more