Category Archives: #Transportation

Rehabilitation of an Abandoned Subdivision

DR Horton Inc. Desert Vista Estates SWP was contracted by DR Horton to rehabilitate an existing abandoned subdivision in Tucson, AZ. The scope of work consisted of clearing and grubbing the existing lots and grading housing pads for future homes. In addition to the pad work, the scope required the reconstruction of 750 LF of Columbus Blvd at Benson Highway. Continue Reading

Read more

Town of Florence, Paving for Florence Gardens Subdivision

Town of Florence Florence Gardens Phase IV & V Florence, AZ This Project takes place in the Florence Gardens community of Florence Arizona. As the paving subcontract, SWP performed 12,668 SY of 3” AC Paving, 24,448 SY of 2.5” AC Paving, 1554 SY of 1.5” AC Pacing and approximately 22101 LF of Thickened Edge.

Read more

US Bureau of Reclamation, Strand Avenue/Avenue D Bridge Replacement

Strand Avenue/Avenue D Bridge Replacement USBR advertised for bids a project to replace various bridge structures with box structures as the existing infrastructure was needing increased maintenance. This project was to replace the Avenue D Bridge over the Salinity Canal along the Salinity Canal Levee Road. MCI was the General Contract and SWP was contracted to grade the road after Continue Reading

Read more

Social media & sharing icons powered by UltimatelySocial