FHWA, ODOT 36 Eugene Highway-Greenleaf Creek Road Improvements

\"\"

OR 36 – Florence-Eugene Highway to Greenleaf Creek Eugene, OR (HUBZone Set-Aside): Prime Contractor    $1,535,294

The work consisted of roadway surface preservation as a chip seal, signs, pavement markings, guardrails, and other associated work.

The project is located 35miles west of Eugene, Oregon.  The total length of the work was 21.4 miles and required an extensive temporary traffic control program.

Major Quantities included:

  • 285,000    SQYD     Chip Seal
  • 510             TON       Emulsified Asphalt
  • 2,650         SQYD     Asphalt Concrete Pavement Patch
  • 21.4            MILE      Rumble Strip
  • 918,000     FT           Permanent Pavement Markings
  • 100             EA           Sign System