OR 36 – Florence-Eugene Highway to Greenleaf Creek Eugene, OR (HUBZone Set-Aside): Prime Contractor $1,535,294
The work consisted of roadway surface preservation as a chip seal, signs, pavement markings, guardrails, and other associated work.
The project is located 35miles west of Eugene, Oregon. The total length of the work was 21.4 miles and required an extensive temporary traffic control program.
Major Quantities included:
- 285,000 SQYD Chip Seal
- 510 TON Emulsified Asphalt
- 2,650 SQYD Asphalt Concrete Pavement Patch
- 21.4 MILE Rumble Strip
- 918,000 FT Permanent Pavement Markings
- 100 EA Sign System