FHWA, Lee’s Ferry Road Scour Protection

Lee’s Ferry Road: Prime Contractor 

The USDOT, Central Federal Lands Highway Division of the Federal Highway Administration contracted with SWP to perform scour protection and spot repairs caused by a storm event greater than a 100-year event within the Glen Canyon National Recreation Area.

Improvements included:

  • Curb and gutter reconstruction
  • Drainage
  • Scour protection
  • Countermeasures
  • Drainage excavation and bank protection

Major quantities included:

  • 405 yd3 of concrete
  • 15 yd3 of concrete
  • 600 yd3 of roadway excavation
  • 450 lineal feet of ditch reconditioning.

Ancillary items to construction included temporary traffic control, construction survey & staking, quality control, and mobilization.