FHWA, ODOT 26 Widening Improvements & Trailhead Relocation

Mirror Lake Trailhead Relocation   

SWP was awarded this contract by the Western Federal Lands Division of FHWA to complete a widening and improvement project on Oregon DOT 26.

Project Work Included:

  • Mill and fill for 3,390 Ton of an ODOT Type 1
  • Asphalt Concrete Pavement
  • Guardrail placement
  • Sign systems
  • Delineators
  • Rumble strip
  • Pavement markings
  • ITS sign system.
  • Fixture replacements
    • Trash receptacle
    • Bicycle storage racks
    • Picnic table
    • Vault toilet
    • Stairways
    • Handrail
    • Pedestrian rail
    • Trail kiosk

The trailhead parking lot was expanded to accommodate 22 additional parking spaces utilizing a welded wire face and a mechanically stabilized earth wall.

SWP removed and replaced nine (9) structural timber and lumber pressure treated pedestrian bridges.