Saguaro National Park: Prime Contractor $748,081.93
The USDOT, Central Federal Lands Highway Division of the Federal Highway Administration contracted with SWP on a roadway safety improvements signing and striping project at Saguaro National Park in Tucson, AZ.
The project included:
- Demolition and removal of structures
- Shoulder reconditioning
- Low water crossing concrete widening
- Rip rap
- Fog coat
- Signing and pavement markings
Total project length was 19.08 miles.