Ford Arizona Proving Grounds, Storm Damage Repair

Ford Arizona Proving Grounds Storm Damage Repair & Drainage Construction: Subcontractor 

SWP was brought in the initially to repair storm damage caused by the extreme rainfall

  • Install drainage culverts and catch basin, & provide safety enhancements
  • Subsequent investigation by Ford personnel
  • SWP found additional storm damage under a critical testing surface.
  • An additional Job Order was initiated to grout the annular space of an existing bored culvert, install a catch basin and riprap inlet.
  • The additional Job Order included a SWP proposed contingency for a potential over-run in grout.
  • It was not necessary to utilize the contingency amount.