Recos & Market Pad 2: Subcontractor  $119,187

SWP was contracted to do the horizontal portion of this commercial complex.  The work included:

  • Remove AC Paving
  • Remove Curb & Gutter
  • Scarify 12” & Re-compact
  • Over excavation and re-compact below footings
  • Import and place 12” building pad soils
  • Fine grade the site to +/-0.10”
  • SWPPP
  • Best Management Practices
  • Grade for new Curb & Gutter
  • Pave 3” asphalt concrete of 6” ABC
  • Adjust manholes to new AC grade
  • Adjust valve boxes to new AC grade
  • All signage
  • All striping
  • Dust Control Plan