Western Region Pavement Preservation MATOC
Western Federal Lands – FHWA
Multiple States
This Multiple Award Task Order Contract (MATOC) covered a 5-year period for Roadway construction consisting of rapid response roadway surfacing, resurfacing, and repair contracting tool for work in Oregon, Idaho, Washington, Montana, Texas, Nevada, Arizona, Utah, Colorado, New Mexico, Wyoming, Oklahoma, California and other states as required.
Work under this MATOC included traffic control, contractor sampling and testing, asphalt milling, profile grinding, asphalt paving, thin asphalt overlays, patching, crack & joint sealing for flexible and rigid pavements, chip sealing, micro surfacing, slurry seals, ultra-thin bonded wearing course, sub-excavation, minor drainage improvements, placement of aggregate, roadway pulverization, grading, and slope stabilization.