KOMAN Holdings

USFS, Bartlett Lake Site Improvements

Bartlett Lake Recreation Site Improvements.: Prime Contractor $40,998  The project involved pavement repair to an existing parking lot and boat ramp access.  SWP performed:  Saw cutting Milling Removing and disposing of asphalt Furnishing Placing and compacting new asphalt surfacing Pavement striping Repairing potholes and surface cracks Temporary traffic control measures were incorporated into the work.

USFS, Bartlett Lake Site Improvements Read More »

USFS, Bartlett Lake Rec Site Improvements

    Bartlett Lake Recreation Area: Prime Contractor $1,829,375 The project involved pavement repair to an existing parking lot and boat ramp access. Work included: Saw cutting Milling Removing and disposing of asphalt Furnishing Placing and compacting new asphalt surfacing Pavement striping Repairing potholes and surface cracks. Temporary traffic control measures were incorporated into the work.

USFS, Bartlett Lake Rec Site Improvements Read More »

ADOT, Ashfork Highway Road Improvements (Sub)

Ashfork Highway, Rattlesnake to Junction US 93: Subcontractor $15,317 The work is located in Mohave County on Interstate 40 between mileposts 56.94 and 71.70, approximately five miles east of the City of Kingman. Project Work Included: Milling and replacing existing concrete pavement Removing and replacing existing guardrail Replacing existing bridge rail with a concrete barrier Sealing

ADOT, Ashfork Highway Road Improvements (Sub) Read More »

USFS, Coronado National Forest Road Resurfacing

Roads Resurfacing, Coronado National Forest: Prime Contractor    $825,000 The work consisted of resurfacing portions of two U.S. Forest Service jurisdiction roads west of Interstate 19 and northwest of Nogales, Arizona. The project locations are on a portion of the unpaved Tres Bellotas Road south of the town of Arivaca, Arizona, and on the unpaved

USFS, Coronado National Forest Road Resurfacing Read More »

FHWA, Lake Mead Recreation Area Guardrail Repairs

Guardrail Repairs, Lake Mead: Prime Contractor    $99,712 The purpose of this project was to provide all labor, supervision, material, and equipment for the repair of damaged guardrails throughout the Lake Mead National Recreation Area. The project work consisted of: Replaced damaged rails. Removed and resetting damaged and displaced posts. Repaired and replaced damaged end

FHWA, Lake Mead Recreation Area Guardrail Repairs Read More »

FHWA, ODOT 36 Eugene Highway-Greenleaf Creek Road Improvements

OR 36 – Florence-Eugene Highway to Greenleaf Creek Eugene, OR (HUBZone Set-Aside): Prime Contractor    $1,535,294 The work consisted of roadway surface preservation as a chip seal, signs, pavement markings, guardrails, and other associated work. The project is located 35miles west of Eugene, Oregon.  The total length of the work was 21.4 miles and required an

FHWA, ODOT 36 Eugene Highway-Greenleaf Creek Road Improvements Read More »

FHWA, Lake Mary Road and Willow Creek Bridge Improvements

Federal Highway Administration, Lake Mary Road: Prime Contractor    $8,190,716 The project included one schedule that consisted of 4R improvement of portions of Forest Highway 3, also known as Lake Mary Road in Coconino County Arizona.  The project is within the Coconino National Forest. The second schedule project consists of minor shoulder widening, pulverizing of

FHWA, Lake Mary Road and Willow Creek Bridge Improvements Read More »

US Army, Herrera Hall Army Reserve Parking Areas Repairs

 Repair Parking Areas, Mission & Installation Contracting Command, Herrera Hall: Prime Contractor   $24,878 SWP was responsible for making parking lot repairs at the Herrera Hall Army Reserve Center in Mesa, AZ including adequate traffic and parking control for the duration of the project.  The work was completed in stages to give the owner ample time

US Army, Herrera Hall Army Reserve Parking Areas Repairs Read More »

ADOT, Construction Administration Projects

Temporary Technical Engineering Personnel Services: Prime Contractor   $150,000,000 SWP provided Temporary Technical Engineering Personnel (Temp Tech) during peak workloads on an as needed basis. Construction project, supervision, management and on the job training Construction survey (provide total survey workstation and vehicle) Construction inspection for items including but not limited to: roadway, structures, electrical, landscape, permits

ADOT, Construction Administration Projects Read More »