FHWA, Katherine Landing Access Road and Parking Lot Improvements

Katherine Lake Bullhead, AZ: Prime Contractor $11,448,000 PROJECT DESCRIPTION: SWP performed a full depth, full-width 4R improvement of Katherine Access Road as the main roadway into the Katherine Access Marina. The 4R work included widening the roadway template; new drainage structures; improved pullouts adjacent to the roadway; paved entrance parking area; resurfacing existing Marina area parking lots and boat launch areas Continue Reading

Read more

FHWA, ODOT 26 Widening Improvements & Lake Mirror Trailhead Relocation

Mirror Lake Trailhead Relocation     $5,460,018 SWP was awarded this contract by the Western Federal Lands Division of FHWA to complete a widening and improvement project on Oregon DOT 26. Project Work Included: Mill and fill for 3,390 Ton of an ODOT Type 1 Asphalt Concrete Pavement Guardrail placement Sign systems Delineators Rumble strip Pavement markings ITS sign system. Fixture Continue Reading

Read more

USFS, Shady Creek Trail Replacement Bridge

Bridge Replacement, Mt. Hood National Forest Service: Prime Contractor    $185,290 SWP was contracted by the United States Forest Service for the replacement of structure for an existing single span pressure treated timber trail bridge over Shady Creek, located within the Multnomah Falls Recreation Area, Bridal Veil, OR.  The bridge was replaced with a steel beam and precast concrete superstructure. Continue Reading

Read more

USFS, Tish Creek Trail Bridge Replacement

Tish Creek  Trail Bridge Replacement $130,000 The Tish Creek Trail Bride was damaged by fallen trees during a major storm event.  The bridge is located in the Columbia River Gorge- National Scenic Area on trail #440 at M.P. 2.  By ground, the bridge is only accessible by trail. The project work included: Removal of the existing damaged trail bridge superstructure. Disposal Continue Reading