Site Work

Craftco Dirt Lot Sealing

Craftco: Prime Contractor $2,167,262 Craftco contracted SWP to transform an 8,400 SY dirt lot into a sealed surface for dust control purposes. SWP leveled and created positive drainage on 8,400 SY existing lot. SWP Imported crushed asphalt (millings) as base stabilizer dust control product and waterproofed the surface with asphalt emulsion. SWP completed this in 5 […]

Craftco Dirt Lot Sealing Read More »