striping

El Dorado Canyon Road Repair

Storm Repairs, Lake Mead National Recreation Area: Prime Contractor $752,252 The USDOT, Central Federal Lands Highway Division of the Federal Highway Administration contracted with SWP to perform emergency repairs to 3 sections, within the Lake Mead National Recreation Area. Work Included: Field designs and repairs Traffic control Quality control Erosion control Rip Rap Hot Asphaltic paving […]

El Dorado Canyon Road Repair Read More »

USFS, Bartlett Lake Site Improvements

Bartlett Lake Recreation Site Improvements.: Prime Contractor $40,998  The project involved pavement repair to an existing parking lot and boat ramp access.  SWP performed:  Saw cutting Milling Removing and disposing of asphalt Furnishing Placing and compacting new asphalt surfacing Pavement striping Repairing potholes and surface cracks Temporary traffic control measures were incorporated into the work.

USFS, Bartlett Lake Site Improvements Read More »

FHWA, Lake Mary Road and Willow Creek Bridge Improvements

Federal Highway Administration, Lake Mary Road: Prime Contractor    $8,190,716 The project included one schedule that consisted of 4R improvement of portions of Forest Highway 3, also known as Lake Mary Road in Coconino County Arizona.  The project is within the Coconino National Forest. The second schedule project consists of minor shoulder widening, pulverizing of

FHWA, Lake Mary Road and Willow Creek Bridge Improvements Read More »

FHWA, Manhattan Main Street Design-Build

Manhattan Main Street Design-Build: Prime Contractor $2,500,000 The USDOT, Central Federal Lands Highway Division of the Federal Highway Administration contracted with SWP to Design & Build a 0.8 mile section on Main Street in Manhattan, NV. Design activities included: Roadway & Drainage design Hydrological Engineering Temporary and Permanent Traffic Control Environmental Documents and Permitting (Cultural Survey,

FHWA, Manhattan Main Street Design-Build Read More »