USFS, Shady Creek Trail Replacement Bridge

Bridge Replacement, Mt. Hood National Forest Service: Prime Contractor    SWP was contracted by the United States Forest Service for the replacement of structure for an existing single span pressure treated timber trail bridge over Shady Creek, located within the Multnomah Falls Recreation Area, Bridal Veil, OR.  The bridge was replaced with a steel beam

USFS, Shady Creek Trail Replacement Bridge Read More »

FHWA, ODOT 26 Widening Improvements & Trailhead Relocation

Mirror Lake Trailhead Relocation    SWP was awarded this contract by the Western Federal Lands Division of FHWA to complete a widening and improvement project on Oregon DOT 26. Project Work Included: Mill and fill for 3,390 Ton of an ODOT Type 1 Asphalt Concrete Pavement Guardrail placement Sign systems Delineators Rumble strip Pavement markings

FHWA, ODOT 26 Widening Improvements & Trailhead Relocation Read More »

new drainage structure improvements

FHWA, Katherine Landing Access Road and Parking Lot Improvements

Katherine Lake Bullhead, AZ: Prime Contractor  PROJECT DESCRIPTION: SWP performed a full depth, full-width 4R improvement of Katherine Access Road as the main roadway into the Katherine Access Marina. The 4R work included widening the roadway template; new drainage structures; improved pullouts adjacent to the roadway; paved entrance parking area; resurfacing existing Marina area parking lots

FHWA, Katherine Landing Access Road and Parking Lot Improvements Read More »

repaving of road

Mountain Brook Golf Club Pavement Preservation

Mountain Brook Golf Club: Prime Contractor  Mountain Brook Golf Club is located in  Gold Canyon, AZ.  SWP worked hand-in-hand with the customer on a construction sequence that would allow the full-service clubhouse and restaurant to remain operational during our work activities. The project included: Asphalt patching Crack sealing Type II slurry seal Pavement markings. This

Mountain Brook Golf Club Pavement Preservation Read More »

parking lot striping

City of Phoenix, Parking Lot Striping

Parking Lot Striping, City of Phoenix: Prime Contractor   Project work included: removing conflicting pavement markings 4.0 Black Out of existing lines 4.1 Water Blasting of existing lines 4.2 Abrasive blasting of existing lines 4.3 Black Out of handicap space Handicap and Standard Signs Installed: Handicap Aluminum sign on fence, attached with wire Handicap Aluminum

City of Phoenix, Parking Lot Striping Read More »

organ Pipe national park parking lot

Crack Seal of Paved Roads and Parking Areas

Crack Seal of Paved Roads and Parking Areas, Organ Pipe Cactus National Monument: Prime Contractor    SWP was contracted to clean out asphalt cracks and seal cracks with bituminous material. The work was accomplished with minimal impact to existing facilities, vegetation, and the visiting public. SWP blew out cracks with high-pressure compressed air to thoroughly

Crack Seal of Paved Roads and Parking Areas Read More »

tonto national forest parking lot

USFS, Tonto National Forest Road Maintenance

Tonto National Forest Road maintenance – IDIQ –Prime Contractor  Project Scope of Work: The Forest Service awarded an indefinite delivery indefinite quantity (IDIQ) contract to SWP to provide road maintenance services for all ranger districts on the Tonto National Forest, for a five-year period. The project consists of asphalt pavement maintenance, ditch cleaning, culvert basin cleaning,