komangs2022stg

Pinal County, Pavement Preservation Task Orders 5 & 6

Pinal County, Job Order Contracting, Pavement Preservation & Repair Services, Task Orders #5 & #6: Prime Contractor  The Pinal County Department of Public Work (PCDPW) was seeking experienced contractors to perform miscellaneous construction methods and repair services including chip seal, crack seal, slurry seal, micro-seal, fog seal, and paving projects utilizing the Job Order Contracting (JOC) project […]

Pinal County, Pavement Preservation Task Orders 5 & 6 Read More »

Pinal County, Pavement Preservation & Repair Services

Pinal County, Job Order Contracting, Pavement Preservation & Repair  Services:  Prime Contractor  PROJECT DESCRIPTION: The Pinal County Department of Public Works (PCDPW) was seeking experienced contractors to perform miscellaneous construction methods and repair services including: Chip Seal, Crack Seal, Slurry Seal, Micro & Fog Seal including paving projects utilizing Job Order Contracting (JOC) project delivery methods. SCOPE

Pinal County, Pavement Preservation & Repair Services Read More »

USFS, FSR 516 Pavement Rehabilitation Project

FSR 516 Pavement Rehabilitation Project Coconino National Forest Flagstaff, AZ: Prime Contractor  FSR 516 Pavement Rehabilitation Project consisted of saw cutting, cleaning, and repaving various deficiencies such as potholes, areas of fatigue cracking and large cracks. The project will also consist of cleaning and crack sealing areas of minor cracking on the existing asphalt surface

USFS, FSR 516 Pavement Rehabilitation Project Read More »

Road Maintenance and Construction IDIQ, Apache-Sitgreaves National Forests

Black Mesa Ranger District, Road Maintenance and Construction IDIQ, Apache-Sitgreaves National Forests, Springerville, AZ: Prime Contractor  The majority of the work consisted of aggregate road maintenance, repair, and some construction. In addition to clearing drainages, installation or removal of culverts and cattle guards, sign installation, mechanical equipment trail maintenance, concrete structures construction and concrete repair.

Road Maintenance and Construction IDIQ, Apache-Sitgreaves National Forests Read More »

New Mexico Road Maintenance & Construction

USFS New Mexico Road Maintenance & Construction IDIQ New Mexico: Prime Contractor The USFS Southwest Region awarded SWP a Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) contract for the state of New Mexico. The contracts were for road maintenance, decommissioning, surfacing and minor construction. The work included routine road maintenance activities such as surface blading, constructing

New Mexico Road Maintenance & Construction Read More »

FHWA, Northern California Pavement Preservation Project

CA NPS PP 216(9) SWP Project #910-1803Western Federal LandsNorthern California Pavement Preservation Project(HUBZone Set-Aside) PROJECT: CA NPS PP 2016(9) Pavement Preservation Northern California, Siskiyou, Shasta and Humboldt Counties, California LOCATION: Lava Beds National Monument is located approximately 110 miles east of Yreka, CA. Whiskeytown National Recreation Area is located approximately 8 miles west of Redding,

FHWA, Northern California Pavement Preservation Project Read More »

Pavement Preservation and Repair Services

Pinal County Job Order Contracting Pavement Preservation & Repair Services JOC Task Order #7, Red Rock Village Crack Seal:  SWP was assigned this task order to provide crack seal maintenance within the subdivision.  Cracks were cleaned and then sealed with 49,450LBS of CRAFCO Polyflex Type III.  Additionally, SWP provided the entire traffic control, construction staking &

Pavement Preservation and Repair Services Read More »

FHWA, Western Region Pavement Preservation

Western Region Pavement Preservation MATOC Western Federal Lands – FHWAMultiple States This Multiple Award Task Order Contract (MATOC) covered a 5-year period for Roadway construction consisting of rapid response roadway surfacing, resurfacing, and repair contracting tool for work in Oregon, Idaho, Washington, Montana, Texas, Nevada, Arizona, Utah, Colorado, New Mexico, Wyoming, Oklahoma, California and other states

FHWA, Western Region Pavement Preservation Read More »

Pavement Repair

FY 18/19 Arterial/Collector Pavement Repair – Phase I SWP performed milling and/or pulverizing, pavement preparation, paving, and striping/pavement markings. 202 Milling – 285,000 SY, 404 Asphaltic tack coat CSS-1h 1:1 – 175 Ton, 406 Asphaltic concrete PAG#2 (arterial) – 32,000 Ton, 406 Bituminous adjustment (if applicable) – 10,000 USD, 406 Fuel adjustment (if applicable) –

Pavement Repair Read More »