ADOT, Happy Valley Parkway Design-Build (Sub)

SR303 Loop, US60- Happy Valley Parkway: Prime Contractor $29.8 M SWP was brought on in the initial stages to provide: Design and constructability review Write quality control plan and quality management plan Supervise the Quality Control Program. Oversight of PCCP placement and inspection to ensure compliance with specifications and standards. The project milled/pulverized existing asphaltic concrete […]

ADOT, Happy Valley Parkway Design-Build (Sub) Read More »

FHWA, BLM, Las Cienegas National Conservation Roadway Improvements

Las Cienegas National Conservation Area Sonoita Arizona: Prime Contractor  $3,707,982 The USDOT, Central Federal Lands Highway Division of the Federal Highway Administration in coordination with the US Bureau of Land Management contracted with SWP to complete 13 miles of roadway improvements at the Las Cienegas National Conservation Area. Improvements included: Surveying and staking Import of

FHWA, BLM, Las Cienegas National Conservation Roadway Improvements Read More »

Craftco Dirt Lot Sealing

Craftco: Prime Contractor $2,167,262 Craftco contracted SWP to transform an 8,400 SY dirt lot into a sealed surface for dust control purposes. SWP leveled and created positive drainage on 8,400 SY existing lot. SWP Imported crushed asphalt (millings) as base stabilizer dust control product and waterproofed the surface with asphalt emulsion. SWP completed this in 5

Craftco Dirt Lot Sealing Read More »

FHWA, Bitter Lake Wildlife Refuge Road Improvements

Bitter Lake National Wildlife Refuge: Prime Contractor $2,167,262 The USDOT, Central Federal Lands Highway Division of the Federal Highway Administration contracted with SWP on an 8.05 mile AB and Hot Asphaltic Concrete Paving project at the Bitter Lake National Wildlife Refuge outside of Roswell, NM. Project Work Included: Demolition Roadbed reconditioning Placement of aggregate surface course

FHWA, Bitter Lake Wildlife Refuge Road Improvements Read More »

ADOT, SR 74 Morristown-New River Highway Asphalt Improvements (Sub)

SR 74, Morristown- New River Highway, Picacho Was to Junction I17: Subcontractor $12,750  Located on SR 74 in Maricopa County, beginning at Milepost 22.42 and extending easterly to Milepost 30.58 for a distance of approximately 8:16 miles. The project is located west of Carefree between Picacho Wash and 1-17. Project Work Included: Milling the existing

ADOT, SR 74 Morristown-New River Highway Asphalt Improvements (Sub) Read More »

FHWA, Muleshoe Wildlife Refuge Auto Tour Route Improvements

Muleshoe National Wildlife Refuge (Texas): Prime Contractor $748,980.30 The USDOT, Central Federal Lands Highway Division of the Federal Highway Administration contracted with SWP on a 4.5 miles AB roadway project at the Muleshoe National Wildlife Refuge in Muleshoe, TX. Major project activities included: Aggregate surface course Culvert replacements Placement of riprap Minor grading of various

FHWA, Muleshoe Wildlife Refuge Auto Tour Route Improvements Read More »