Pavement Repair
FY 18/19 Arterial/Collector Pavement Repair – Phase I SWP performed milling and/or pulverizing, pavement preparation, paving, and striping/pavement markings. 202 Milling – 285,000 SY, 404 Asphaltic tack coat CSS-1h 1:1 – 175 Ton, 406 Asphaltic concrete PAG#2 (arterial) – 32,000 Ton, 406 Bituminous adjustment (if applicable) – 10,000 USD, 406 Fuel adjustment (if applicable) – […]